Kitchen hanging cabinet lifting dishes pull baskets 304 stainless steel double layer Damping hydraulic smooth lift bowls shelf
Kitchen hanging cabinet lifting dishes pull baskets 304 stainless steel double layer Damping hydraulic smooth lift bowls shelf
SPECIFICATIONS
Brand Name: NoEnName_Null
Use: Dish and Bowl
Origin: Mainland China
Installation Type: Bolt Inserting Type
Classification: Non-folding Rack
Applicable Space: Kitchen
Feature: Eco-Friendly
Model Number: LL2
Material: STAINLESS STEEL
Type: Storage Holders & Racks
Material:304 Stainless Steel/202 Stainless Steel Optional
with pull-out stainless steel water tray
Damping hydraulic smooth lift
Loading weight :about 15kg
Our pull basket requires accurate internal sizes of the cabinet, otherwise it cannot be installed. If you are not sure which type you should purchase, you can tell me the following sizes of your cabinet,we will recommend suitable type or customize for you.
Cabinet internal height:
Cabinet internal depth:
Cabinet internal width:
Customization time is approximately 7 days
If you don't want to customize, you can choose to add wooden boards on both sides inside the cabinet.
Product Size:
36x27×52cm(400 Type)
41x27×52cm(450 Type)
46x27×52cm(500 Type)
56x27×52cm(600 Type)
66x27×52cm(700 Type)
71x27×52cm(750 Type)
76x27×52cm(800 Type)
86x27×52cm(900 Type)
Installation requirements:
Cabinet internal height: greater than 58cm
Cabinet internal depth: greater than 29cm
Cabinet internal width: 36-37cm(400 Type)
Cabinet internal width: 41-42cm(450 Type)
Cabinet internal width: 46-47cm(500 Type)
Cabinet internal width: 56-57cm(600 Type)
Cabinet internal width: 66-67cm(700 Type)
Cabinet internal width: 71-72cm(750 Type)
Cabinet internal width: 76-77cm(800 Type)
Cabinet internal width: 86-87cm(900 Type)
Basket installation steps;
Step 1: Fix the side plate and the lower plate
Step 2:Fix the side plate and upper layer plate
Step 3: Connect the other side plate
Step 4 : Fix the lower tie rod
Step 5: Use the positioning template to determine the fixed position of the elevator
Step 6: Fix one side of the elevator
Step 7: Fix the other side of the elevator
Step 8: Fix the linkage rod with the elevators on both sides
Step 9: Fix the fixed plate of the elevator and the side plate of the basket
Step 10: Test whether the lifting is normal and the installation is completed.
Note:
1.The corresponding positions of fixing points on both sides of the elevator are consistent
2.After installing the elevators on both sides, test whether the elevators return normally
3.The linkage rod does not need to be fit to the elevator. fixed firmly it is ok.
4.The elevator wll automatically return to its original position when it is unloaded. When the load is about 2-5kg, it can stop at any time(depending on the load and size, the effect will be different)
Tips:
Steps 1 to 3 use M4x6 screws to connect with M4 nuts,25pcs in total.
Step 4 Use M6X10 screws to fix the lower tie rod,2pcs in total
Steps 5 to 7 use 4x14 self tapping screws,1Opcs in total
Step 8: Connect with m5x8 screws,4pcs in total
Step 9 Use m5 screws to connect 4 on the left and 4 on the right, 8pcs in total